New Construction Roofing: A Guide for Ontario Builders & Homeowners

July 2, 2026 · 5 min read · By 519 Roofing

Roofing a new build is different from re-roofing an existing home — it runs on the builder's schedule, has to protect the structure the moment framing is done, and sets the warranty a buyer inherits.

New construction roofing is the process of drying-in and installing the roof system on a home while it is still being built. On a new build in Southwestern Ontario, roofing has to coordinate with framing, weatherproof the structure quickly, and finish to a standard that passes final occupancy without deficiencies. Here is how the process works and what builders and homeowners should look for.

The three stages of a new construction roof

  • Dry-in: Immediately after framing, underlayment, ice and water shield, and drip edge go over the sheathing to make the build weathertight. This is the most time-sensitive step — an unprotected structure can take on serious water damage in a single Ontario storm. Learn how our dry-in service works.
  • Installation: Shingles or metal panels are installed once the build schedule calls for it. A clean, professional crew matters here — the roof is a visible reflection of the builder's quality.
  • Documented inspection: Every job should close with a real-time inspection report — photos, findings, and sign-off — so a roofing deficiency never holds up occupancy. See what our inspection covers.

Choosing the right roofing system

Most Ontario residential builds use one of three systems:

For builders: beyond price, the things that actually protect your schedule are confirmed scheduling, fast dry-in, WSIB and $2M liability coverage, a zero-deficiency standard, and warranty registration. 519 Roofing has completed 2,500+ installations across Windsor, London, Chatham-Kent, and Sarnia and is 1 of only 4 Owens Corning Preferred Contractors in the region.

Warranties a buyer can inherit

As an Owens Corning Preferred Contractor, we register manufacturer warranties in the homeowner's name on every eligible asphalt job — a transferable selling feature at no extra cost to the builder. Read more about warranty registration.

Frequently asked questions

How long does it take to roof a new construction home? Typically 1–2 days for asphalt and 2–3 days for standing seam metal on a standard 1,500–2,000 sq ft home. Dry-in can often be done the same day framing finishes.

How far ahead should a builder book a roofer? In peak season (April–October), 2–4 weeks for single-unit builds and 4–8 weeks for multi-unit developments. The earlier a roofer is looped into your build calendar, the better the schedule aligns.

Who do we serve? Builders and homeowners across Southwestern Ontario — Windsor, London, Chatham-Kent, Sarnia, and surrounding communities.

Building in Southwestern Ontario? Explore our full new construction roofing services or get a builder quote — 48-hour turnaround.

Get a Builder Quote
← Back to Blog